02-28

Luoxidu—Jinhua of Zhejiang

The Xiluodu-Zhexi ±800kV UHV DC transmission project starts from Yibin, Sichuan in the west, and ends at Wuyi, Zhejiang in the east. The DC transmission line is about 1728km in length. It is an important part of the first phase of the Jinsha River UHV transmission project and also my country’s "Twelfth Five-Year Plan" Key renewable energy projects during the period. The company completed the delivery from May to July 2013 and is now in operation.
02-28

Three Gorges

The Three Gorges Project has attracted worldwide attention and has extremely high requirements for product quality and technology. Most of its hydropower transmission projects use ultra-high voltage levels of 500,000 volts. Since Nanjing Electric (Group) Co., Ltd. sent the first batch of tempered glass insulators to the Three Gorges Hydropower Transmission Project in 1997, it has provided 1.18 million tempered glass insulators for 31 500 kV lines of the Three Gorges Hydropower Transmission Project, accounting for approximately the insulators used in the project. 60% of the total, accounting for about 80% of the total glass insulators used in the project, and the length of the line exceeds 5,200 kilometers. It has contributed to the localization of the mechanical and electrical equipment of the Three Gorges Project and achieved good economic and social benefits.
02-28

Jinping—Southern Jiangsu

The Jinping-Sunan ±800kV UHV DC transmission line is the first UHV DC transmission project for the company's products to be put into operation. It starts from Xichang, Sichuan and ends in Tongli, Suzhou, Jiangsu. The total length is about 2,100 kilometers. The company completed the delivery from August to October 2011 and is now in operation.
02-28
Previous page
1
Luoxidu—Jinhua of Zhejiang

Luoxidu—Jinhua of Zhejiang

The Xiluodu-Zhexi ±800kV UHV DC transmission project starts from Yibin, Sichuan in the west, and ends at Wuyi, Zhejiang in the east. The DC transmission line is about 1728km in length. It is an important part of the first phase of the Jinsha River UHV transmission project and also my country’s "Twelfth Five-Year Plan" Key renewable energy projects during the period. The company completed the delivery from May to July 2013 and is now in operation.
Three Gorges

Three Gorges

The Three Gorges Project has attracted worldwide attention and has extremely high requirements for product quality and technology. Most of its hydropower transmission projects use ultra-high voltage levels of 500,000 volts. Since Nanjing Electric (Group) Co., Ltd. sent the first batch of tempered glass insulators to the Three Gorges Hydropower Transmission Project in 1997, it has provided 1.18 million tempered glass insulators for 31 500 kV lines of the Three Gorges Hydropower Transmission Project, accounting for approximately the insulators used in the project. 60% of the total, accounting for about 80% of the total glass insulators used in the project, and the length of the line exceeds 5,200 kilometers. It has contributed to the localization of the mechanical and electrical equipment of the Three Gorges Project and achieved good economic and social benefits.
Jinping—Southern Jiangsu

Jinping—Southern Jiangsu

The Jinping-Sunan ±800kV UHV DC transmission line is the first UHV DC transmission project for the company's products to be put into operation. It starts from Xichang, Sichuan and ends in Tongli, Suzhou, Jiangsu. The total length is about 2,100 kilometers. The company completed the delivery from August to October 2011 and is now in operation.

HERE YOU CAN FIND WHAT YOU WANT

搜索
Search

Overseas Marketing Center:
E-mail :
yuwenwen@ld-cn.com

 

Postcode : 210046

Address: No. 99 Xianxin East Road, Nanjing Economic and Technological Development Zone, Jiangsu Province

这是描述信息

Official Account

这是描述信息

Mobile Station

苏ICP备17028008号   Nanjing Electric Technology Group Co., Ltd.   Powered by www.300.cn