Nanjing Electric’s Public Disclosure of Hazardous Waste Information for the First Three Quarters of 2019
Release date:
2019-10-24 08:33
Source:
| Unified Social Credit Code | 913201926904264114 | Legal Representative | Hu Deliang | ||||||
| Address | No. 99, Xianxin East Road, Nanjing Economic and Technological Development Zone | Production cycle | 302 working days per year; the glass manufacturing department operates 365 days a year on a three-shift system. | ||||||
| Industry sector | Manufacture of other electrical machinery and equipment not elsewhere specified | Contact Person and Phone Number | Tang Jinsong 13605169898 | ||||||
| Main contents of production, operation, and services | Design, manufacturing, sales, and installation services for tempered glass insulators, composite insulators, oil-filled bushings, composite dry-type bushings, and instrument transformers. | ||||||||
| Generation and Disposal of Hazardous Waste | Name | Generation amount (tons) | Sources of hazardous waste | Disposal volume | Disposition outcome | Environmental Impact Assessment Approval | |||
| Used motor oil | 2.55 | Equipment maintenance and oil change | 0 | Nanjing Qiandingchang Environmental Protection Energy Development Co., Ltd. | 1. Ninghuanbiaofu [2010] No. 54 2. Ningkaiwei Xingshen Xuken Zi [2019] No. 99 | ||||
| Oil‑contaminated materials (oil‑impregnated cable paper, oil drums, etc.) | 8.438 | Casing product rework, equipment maintenance | 7.15 | ||||||
| Water-based paint bucket | 3.996 | Glass assembly, | 2.93 | ||||||
| Other hazardous waste contaminants (packaging bags, containers, etc.) | 0.603 | Packaging for glass raw materials | 0 | Pending disposal at the company’s hazardous waste storage facility. | |||||
| Waste battery | 0.16 | Forklift maintenance | 0 | Pending disposal at the company’s hazardous waste storage facility. | |||||
| Hazardous Waste Pollution Prevention and Control Measures | 1. The ground at hazardous waste storage areas shall be treated with epoxy to prevent leakage, and hazardous waste must be collected promptly and stored in compliance with requirements for rain protection, leak prevention, seepage control, wind resistance, and erosion prevention. 2. Regular inspections of hazardous waste collection points and production sites shall be conducted to ensure timely collection; temporary storage must meet the “three‑protection” standards. 3. Emergency response measures and resources shall be improved and refined. | ||||||||
Previous page
Next page
Public Notice of the 2019 Clean Production Audit for Nanjing Electrical Technology Co., Ltd.
Related News
Nanjing Electric Technology Group
















Su Public Security Network Filing No. 32011302322555